Нажмите на кнопку чтоб прослушать текст
Uzbek Русский English
December 2025
M T W T F S S
« Apr    
1234567
891011121314
15161718192021
22232425262728
293031  
Государственная символика/Davlat ramzlari

Телефон доверия/ Ishonch telefoni
(0365) 223-54-71
Подписка на обновления
Name
Email *

Complited projects

Large projects carried out with the participation of  "Buxorogazsanoatqurilish" JSC

  • Manufacture and assembly of electronic gas meters in the Free Industrial Economic Zone of Navoi;
  • Production of equipment for auto gas cumulative compressor stations and automobile gas cylinders in the Free Industrial Economic Zone of Navoi;
  • Plant for the production of polypropylene pipes;
  • Installation of propane-butane mixture at −5 Shurtan;
  • Development field of the South Urtabulak with the construction of a booster compressor station;
  • Expansion tank farms BNPZ;
  • The complex arrangement of gas deposits in the Gazli region;
  • Construction NGKM in the South Kemachi;
  • Overhaul pipeline DBST, I-thread, with the replacement of pipes in the area with the replacement of pipes in areas 28,08−31,0 km (2,92km) and 31,07−33,25 km (2,18km);
  • Reconstruction of the Bukhara Oil & Gas College;
  • Replacement of defective areas on the 28−56 km gas pipeline Bukhara-Ural, III-string, length of 458 p / m;
  • Replacement of defective areas on the 64−98-km pipeline Mubarak Kagan 2 thread;
  • Development infrastructure of Shurtan gas deposit areas with the construction of BCS-2;
  • Construction of BCS in Alan with off-site engineering services;
  • Construction of water pipeline to irrigate land, improvement of cattle breeding, in Gazli, Romitan regions' area of ​​"Northern collector" Jondor district of Bukhara region;
  • The reconstruction of the «Turin Polytechnic University in Tashkent»;
  • Construction of a propane-butane mixture for increasing the production of liquefied gas at the UDP «MGPP»;
  • Complex equipping gas fields in Gazli region. Construction of the border gas condensate fields Kumli, Taylok, Kushimchi Chegarakum. The connecting pipeline UPPG Kumli SDA Uchkyr;
  • Development additional infrastructure (gas condensate field) HCM Samantepa;
  • Artificial pond to reserve technical water supplying to Ustyurt GCC;
  • Reconstruction of the central stadium «Oilmpiya» in Urgench;

 

Accessibility
Click to listen highlighted text! Powered By GSpeech