Complited projects
Large projects carried out with the participation of "Buxorogazsanoatqurilish" JSC
- Manufacture and assembly of electronic gas meters in the Free Industrial Economic Zone of Navoi;
- Production of equipment for auto gas cumulative compressor stations and automobile gas cylinders in the Free Industrial Economic Zone of Navoi;
- Plant for the production of polypropylene pipes;
- Installation of propane-butane mixture at −5 Shurtan;
- Development field of the South Urtabulak with the construction of a booster compressor station;
- Expansion tank farms BNPZ;
- The complex arrangement of gas deposits in the Gazli region;
- Construction NGKM in the South Kemachi;
- Overhaul pipeline DBST, I-thread, with the replacement of pipes in the area with the replacement of pipes in areas 28,08−31,0 km (2,92km) and 31,07−33,25 km (2,18km);
- Reconstruction of the Bukhara Oil & Gas College;
- Replacement of defective areas on the 28−56 km gas pipeline Bukhara-Ural, III-string, length of 458 p / m;
- Replacement of defective areas on the 64−98-km pipeline Mubarak Kagan 2 thread;
- Development infrastructure of Shurtan gas deposit areas with the construction of BCS-2;
- Construction of BCS in Alan with off-site engineering services;
- Construction of water pipeline to irrigate land, improvement of cattle breeding, in Gazli, Romitan regions' area of "Northern collector" Jondor district of Bukhara region;
- The reconstruction of the «Turin Polytechnic University in Tashkent»;
- Construction of a propane-butane mixture for increasing the production of liquefied gas at the UDP «MGPP»;
- Complex equipping gas fields in Gazli region. Construction of the border gas condensate fields Kumli, Taylok, Kushimchi Chegarakum. The connecting pipeline UPPG Kumli SDA Uchkyr;
- Development additional infrastructure (gas condensate field) HCM Samantepa;
- Artificial pond to reserve technical water supplying to Ustyurt GCC;
- Reconstruction of the central stadium «Oilmpiya» in Urgench;

